New General Hospital of Mazatlan is 80% complete 

1012

In addition to presuming the advance of the General Hospital of Mazatlan, the Secretary of Health of Sinaloa commented that the foundation for the New Pediatric Hospital is already built.

With 80% progress in the construction of the new General Hospital of Mazatlan , the ready foundation of the General Hospital of Culiacán and the laying of the first stone for the new Pediatric Hospital of Sinaloa, will improve medical care in the State will be a promise made true for the administration of the Governor, Quirino Ordaz Coppel, affirmed the Secretary of Health, Dr. Efren Encinas Torres.

The head of Health in the state recognized the management that has made the state executive against the federation to achieve the construction of the three hospitals with federal resources which are insured for each of the works that will come to benefit the and the Sinaloans.

He informed that this will not only increase the number of beds, but also in clinics, operating rooms, and care units, for which it is estimated to have a great impact on the well-being of the population.

” The new Hospital of Culiacán has a high impact because the area where one of the aspects of the health system is located is access, both for users and workers, the new hospital knows that it is located in the direction of the educating city, with access without problem, with transportation, “he specified.

He recalled that both the General Hospital of Mazatlan and Culiacán will have vehicular access without problems and will have both 120 beds, new high-tech equipment, in addition to around 900 parking spaces in the case of the HGM and about a thousand in the HGC.

Meanwhile, the new Pediatric Hospital of Sinaloa is estimated to be ready in 14 more months, it will be a hospitalization tower, respecting the area of oncological haemato because it is an area of great value for the Children’s Hospital, in terms of its facilities and equipment.

Source: El Debate

The Mazatlan Post